07976 925334
01226 243 662
The brief was to create more space for storage and a loading bay for their expanding business at their site in Carlton, Barnsley, without disrupting the day to day workflow. We excavated the storage area, laid a stone sub base and concreted to create a flat surface, which we then moved their 10 containers into place using a lifting crane. The remaining loading area was covered with Tarmac to form a hard wearing area for lorries to dispatch their deliveries.